Register

Follow us on Facebook Follow us on Twitter Watch us on YouTube

The slow build....

Slow Build 2

Rate this Entry
by , 25 November 2011 at 20:26 (81 Views)
I dropped the gas tank on the SLAAB and cleaned out 22 years worth of sediment build up.

Tomorrow, I'm gonna pick up a couple of feet of H209 from NAPA. It's fuel hose designed to be submersed in gas.... That combined with the new prepump and 65gph primary should keep me out of the tank for quite a while. Before reinstalling the tank, I'll go ahead and install the new fuel filter as well.
Tags: None Add / Edit Tags
Categories
Uncategorized

Comments

All times are GMT. The time now is 02:33.
Powered by vBulletin® Version 4.2.1
Copyright © 2013 vBulletin Solutions, Inc. All rights reserved.
SEO by vBSEO ©2011, Crawlability, Inc.